Bard B0FG5THNF3

バード尿排出バッグ(逆流防止弁付き)4000mL取扱説明書

1.製品オーバーview

The Bard Urinary Drain Bag is designed for efficient and hygienic collection of urine. This sterile, 4000 mL vinyl bag features an anti-reflux valve to prevent urine backflow, ensuring patient safety and comfort. It includes a double hook hanger and 48-inch tubing for versatile placement and ease of use.

Bard Urinary Drain Bag, 4000 mL capacity, with anti-reflux valve and tubing.

Image 1: Bard Urinary Drain Bag (4000 mL) with tubing and anti-reflux valve.

2. 安全情報

  • For single use only. Discard after use.
  • Do not store in direct sunlight or at extreme temperatures or in high humidity.
  • Do not use if the package is damaged or opened.
  • Consult a healthcare professional for proper usage and disposal instructions.

3. パッケージ内容

Each pack contains 5 sterile urinary drain bags. Each individual bag includes:

  • 1 x 4000 mL Urinary Drain Bag
  • 1 x 48-inch Drainage Tubing
  • 1 x Anti-Reflux Valve
  • 1 x Double Hook Hanger

4. セットアップ手順

  1. 梱包を検査する: Before use, carefully check the sterile packaging. Do not use if the package is opened or damaged.
  2. バッグを準備する: Remove the drain bag from its sterile packaging. Ensure the drain valve at the bottom of the bag is in the closed position.
  3. チューブを接続します。 Connect the 48-inch drainage tubing securely to the catheter. Ensure a tight fit to prevent leaks.
  4. Attach to Bag: Connect the other end of the drainage tubing to the inlet port of the urinary drain bag. Verify that the connection is secure.
  5. バッグの位置: Use the double hook hanger to suspend the drain bag below the level of the patient's bladder. This prevents backflow and ensures proper drainage. The hanger can be attached to a bed frame, wheelchair, or other suitable support.

5. 操作手順

  1. 適切な排水を確保する: Regularly check that the tubing is not kinked or obstructed, allowing for continuous urine flow into the bag.
  2. モニターの音量: The bag is graduated with volume markings up to 4000 mL. Monitor the urine volume regularly as instructed by a healthcare professional.
  3. バッグを空にする:
    • Place a suitable container below the drain valve.
    • Open the drain valve at the bottom of the bag.
    • Allow the urine to drain completely into the container.
    • Close the drain valve securely after emptying.
    • Dispose of the urine according to medical guidelines.
  4. Anti-Reflux Valve: The integrated anti-reflux valve prevents urine from flowing back up the tubing towards the patient, reducing the risk of infection.

6. メンテナンスと清掃

This urinary drain bag is designed for single use and is sterile. It should not be cleaned or reused. After use, dispose of the bag and tubing according to local medical waste disposal regulations.

7。 トラブルシューティング

  • No Urine Flow:
    • Check for kinks or obstructions in the drainage tubing.
    • Ensure the drain bag is positioned below the level of the bladder.
    • すべての接続が安全であることを確認します。
  • 漏れ:
    • Check all connections (catheter to tubing, tubing to bag) for tightness.
    • Ensure the drain valve at the bottom of the bag is fully closed.
    • If the bag itself is damaged, replace it immediately with a new sterile bag.
  • 不快感:
    • Ensure the tubing is not pulling or causing tension.
    • Adjust the position of the bag and tubing for optimal comfort.

If issues persist, consult a healthcare professional.

8. 仕様

容量4000mL
材料ビニール
チューブの長さ48インチ
特徴Anti-Reflux Valve, Double Hook Hanger, Graduated Volume Markings
不妊症Sterile, Single Use
メーカーバード

9. 保証とサポート

For specific warranty information or product support, please refer to the contact details provided on the product packaging or contact Bard customer service directly. As a medical device, proper handling and usage are crucial for its intended function.

関連文書 - B0FG5THNF3

前view Bard CB5002 通信ボード インストール ガイド
Bard CB5002 通信ボードの補足インストール手順。HVAC システムのセットアップ、配線、およびデフォルトのログイン手順について説明します。
前view Bard CRV-V5A 業務用換気扇 設置手順
This document provides detailed installation instructions for the Bard CRV-V5A Full Flow Modulating Low Leakage Commercial Room Ventilator. It covers general information, unpacking, kit components, basic installation procedures, control system notes, blade adjustment, and operational sequences for compatibility with Bard Wall Mount Air Conditioner and Heat Pump models.
前view バード THE WALL-MOUNT™ エアコン:仕様と機能
商業用途向けにエネルギー効率の高い冷却ソリューションを提供する、Bard THE WALL-MOUNT™シリーズの壁掛けエアコンをご紹介します。この資料では、W17A~W60Aモデル(R-410A冷媒使用)、エンジニアリング機能、仕様について詳しく説明します。
前view Bard MULTI-TEC W42-72AC 壁掛けエアコンおよび LC6000-200 監視コントローラの設置手順
Bard MULTI-TEC W42-72AC壁掛けエアコンおよびLC6000-200監視コントローラの包括的な設置ガイド。設置場所の準備、ユニットの取り付け、配線、システムのセットアップ、センサーの設定、操作手順を網羅しています。
前view Bard W12AF-A W12AF-K 壁掛けパッケージエアコン 交換部品マニュアル
Bard 壁掛けパッケージエアコン モデル W12AF-A および W12AF-K の包括的な交換部品マニュアル。キャビネット コンポーネント、機能コンポーネント、コントロール パネル、および送風機アセンブリの詳細が部品番号と図とともに記載されています。
前view Bard 8620-308 PGDx タッチディスプレイ インストールおよび操作マニュアル
このマニュアルは、スタンドアロン型MEGA-TECユニット用Bard 8620-308 PGDxタッチディスプレイの設置、操作、および設定に関する包括的な手順を説明しています。一般情報、セットアップ手順、インターフェースの操作方法、システム設定、トラブルシューティングについて説明しています。