BFT P125002 SB-BAT

BFT ゲートオープナー P125002 SB-BAT 24V DC バッテリーバックアップキット ユーザーマニュアル

Model: P125002 SB-BAT

1.製品オーバーview

The BFT SB-BAT (P125002) is a 24v DC battery backup system designed to ensure continuous operation of your gate opener even during power outages. This kit provides a reliable power source, activating automatically when the main power supply is interrupted and recharging when power is restored.

It is compatible with various BFT gate opener models, including the Deimos BT series, VIRGO - LINX, EOS-SCE, HYDRA N, DEIMOS BT-QSC D-NETTUNO S, SB BAT/SB CARBAT (DEIMOS BT-SB 300), BT BAT 2 (URANO BT ARES 1000 & ARES 1500) NETTUNO B, VENERE D, ARGO, LIBRA C MA - LIBRA C LX.

BFT P125002 SB-BAT Battery Backup Kit components

Figure 1: Contents of the BFT P125002 SB-BAT Battery Backup Kit, including batteries, wiring, and mounting hardware.

2. セットアップとインストール

Installation of the BFT SB-BAT kit is designed to be straightforward. It integrates with your existing BFT gate opener system.

2.1. 安全上の注意

2.2. インストール手順

  1. コンポーネントを解凍します: Carefully remove all items from the packaging. Verify all components are present as shown in Figure 1.
  2. Mount the Battery Housing: Securely mount the battery housing unit near your gate opener's control board, ensuring it is protected from environmental elements.
  3. バッテリーを接続する: Insert the two 12V 1.2Ah batteries into the housing. Connect them according to the wiring diagram provided with the kit (typically in series to achieve 24V DC).
  4. Connect to Gate Opener: Connect the battery backup system's wiring to the designated battery input terminals on your BFT gate opener's control board. Consult your gate opener's manual for precise terminal locations.
  5. 安全な配線: Ensure all wiring is neatly routed and secured to prevent accidental disconnections or damage.
  6. 電力を回復する: Once all connections are secure and verified, restore main power to the gate opener. The smart charger board will begin charging the batteries.
Close-up of BFT P125002 SB-BAT components including batteries and wiring

図2: 拡大図 view of the battery backup kit components, highlighting the batteries and connection wires.

3. 操作

The BFT SB-BAT battery backup system operates automatically to provide uninterrupted gate functionality.

4. メンテナンス

定期的なメンテナンスにより、バッテリー バックアップ システムの寿命と信頼性が確保されます。

5。 トラブルシューティング

This section addresses common issues you might encounter with your BFT SB-BAT battery backup kit.

問題考えられる原因解決
停電中はゲートは作動しませんtage.
  • バッテリーは無料です。
  • 配線接続が緩んでいるか間違っています。
  • Batteries are at end of life.
  • ヒューズが切れました。
  • Ensure main power is connected and the charger board is functioning. Allow 12-14 hours for full charge.
  • Check all wiring connections between the battery kit and the gate opener.
  • Test batteries; replace if necessary.
  • Check and replace the 20A fuse if blown.
Batteries do not seem to be charging.
  • Main power supply issue.
  • Faulty charger board.
  • バッテリーの接続が間違っています。
  • Verify main power to the gate opener.
  • Contact BFT support for charger board diagnosis.
  • Recheck battery wiring according to the manual.

6. 仕様

Key technical specifications for the BFT SB-BAT (P125002) battery backup system:

7. 保証とサポート

For warranty information or technical support, please refer to the documentation included with your purchase or contact BFT customer service directly. Keep your proof of purchase for warranty claims.

You can find more information about BFT products on their official webサイトまたは正規販売代理店を通じて購入できます。

関連文書 - P125002 SB-BAT

前view BFT DEIMOS BT UL/CSA 電気機械式ゲート自動化システム
ラックスライドゲート用の電気機械式自動化システム、BFT DEIMOS BT UL/CSAをご​​覧ください。スマートテクノロジー、24Vの安全動作、そしてシンプルな設置を特徴とするこのシステムは、ゲートのセキュリティと利便性を向上させます。住宅および商業用途向けの技術仕様と利用可能なアクセサリをご覧ください。
前view BFT VIRGO スイングゲートオートメーション 設置マニュアル
BFT VIRGO スイング ゲート自動化システムの包括的なインストールおよびユーザー ガイド。安全性、技術仕様、インストール手順、プログラミング、メンテナンスについて説明しています。
前view BFT CLONIX1-2 & MITTO 2-4 433MHz 無線制御システム インストールガイド
BFT CLONIX1-2 受信機と MITTO 2-4 433MHz 無線制御送信機の包括的なインストール ガイド。ゲートおよびドアの自動化のプログラミング、クローニング、安全性、技術仕様を網羅しています。
前view BFT THALIA のインストールマニュアル: Automazione Cancelli による Quadro Commandi
Questa guida dettagBFT THALIA のインストールとクアドロ コマンドの設定を説明し、自動ポートごとにプロジェクタを作成します。効率的な機能を確保するための特定の技術、および組織の計画を含めます。
前view BFT Phobos BT キット UL クイックリファレンスガイド
BFT Phobos BT Kit UL 自動ゲート オープナー システムのクイック リファレンス ガイド。インストール、配線、プログラミング、トラブルシューティングについて説明します。
前view BFT MITTO 2B リモコンコーディング手順 | レトロリモコン
BFT MITTO 2Bリモコンをゲートオープナー用にコーディングするためのステップバイステップガイド。既存のリモコンと受信機のLCD画面を使った方法も網羅しています。トラブルシューティングのヒントも含まれています。