BFT P125002

BFT SB-BAT P125002 24V DC バッテリーバックアップキット 取扱説明書

For BFT Gate Opener Systems

1. はじめに

This manual provides essential instructions for the installation, operation, and maintenance of the BFT SB-BAT P125002 24V DC Battery Backup Kit. This kit is designed to ensure continuous operation of compatible BFT gate openers during temporary power outages. Please read this manual thoroughly before proceeding with installation or use.

2.製品オーバーview

The BFT SB-BAT P125002 is a 24V DC battery backup system that integrates with specific BFT gate operators. It includes a smart charger board that manages battery charging when main power is available and automatically switches to battery power when the main supply is interrupted.

BFT SB-BAT P125002 Battery Backup Kit components in box

図1:以上view of the BFT SB-BAT P125002 Battery Backup Kit, showing the product box, two batteries, wiring, and mounting hardware.

2.1. キットの構成要素

Individual components of the BFT SB-BAT P125002 Battery Backup Kit

図2:詳細 view of the BFT SB-BAT P125002 kit components, including batteries, wiring, mounting brackets, and the battery holder.

3. 互換性

This battery backup system is compatible with the following BFT gate operator series:

Ensure your gate operator model is listed above for proper functionality.

4. セットアップとインストール

Installation of the BFT SB-BAT P125002 kit is designed to be straightforward. However, it is recommended that installation be performed by a qualified technician to ensure safety and correct operation. Always disconnect main power to the gate operator before beginning installation.

4.1. 安全上の注意

4.2. インストール手順(一般的なガイドライン)

  1. Mount the Battery Holder: Secure the battery holder/mounting base within the gate operator's control box or an appropriate enclosure using the provided mounting brackets and fasteners. Ensure it is stable and accessible.
  2. バッテリーの挿入: Place the two 12V 1.2Ah batteries into the battery holder.
  3. バッテリーを接続する: Connect the batteries in series to achieve 24V DC, following the wiring diagram provided with your specific gate operator or the kit's smart charger board. Ensure correct polarity.
  4. Connect Smart Charger Board: Integrate the smart charger board into the gate operator's control unit. Refer to your gate operator's manual for the specific connection points for the battery backup system.
  5. 安全な配線: Route and secure all wiring to prevent pinching or damage.
  6. 電力を回復する: Once all connections are verified and secure, restore main power to the gate operator. The smart charger board will begin charging the batteries.
  7. テストシステム: Perform a power outage simulation to verify the battery backup system activates correctly and powers the gate operator.

5. 操作手順

The BFT SB-BAT P125002 operates automatically once installed correctly.

5.1. Normal Operation (Power On)

When main power is supplied to the gate operator, the smart charger board within the SB-BAT kit continuously monitors the battery charge level. It will charge the batteries as needed to maintain them at full capacity.

5.2。 Power Outage Operation (Power Off)

停電の場合tage, the smart charger board automatically detects the loss of main power and switches the gate operator to battery power. The gate operator will then function normally using the stored energy in the batteries. The duration of operation on battery power depends on the frequency of gate usage and the charge level of the batteries.

6. メンテナンス

Regular maintenance ensures the longevity and reliability of your battery backup system.

6.1. バッテリーの充電

電源投入後tage, once main power is restored, the smart charger board will automatically begin recharging the batteries. A full recharge typically takes 12~14時間. It is important to allow sufficient time for batteries to fully recharge after use.

6.2. Fuse Check

システムには、 20Aヒューズ for protection. If the battery backup system fails to operate or charge, inspect the fuse for continuity. Replace with a fuse of the exact same rating if necessary. Always disconnect power before checking or replacing fuses.

6.3. 電池の寿命と交換

Batteries have a finite lifespan. Periodically test the system by simulating a power outage to ensure batteries hold a charge and can power the gate operator. If performance degrades significantly, consider replacing the batteries. Use only recommended replacement batteries (2x 12V 1.2Ah sealed lead-acid).

7。 トラブルシューティング

If your BFT SB-BAT P125002 battery backup system is not functioning as expected, consider the following:

For persistent issues, contact BFT technical support or a qualified service technician.

8. 仕様

特徴仕様
モデル番号P125002
電池のタイプ密閉型鉛蓄電池
バッテリー容量2x (12V 1.2Ah)
出力巻tage24V DC(公称)
チャージVoltage27.2V
充電電流130mA
バッテリーの充電時間12~14時間
Exhausted Battery Protection Threshold20.4V
ヒューズ定格20A
動作温度Data detected with external temperature of: 25°C (77°F)

9. 保証とサポート

For warranty information, please refer to the documentation provided with your original purchase or contact BFT customer support directly. For technical assistance, installation queries, or troubleshooting beyond the scope of this manual, please contact your authorized BFT dealer or BFT technical support.

BFT Contact Information: Please visit the official BFT web最新の連絡先の詳細とサポート リソースについては、こちらのサイトをご覧ください。

関連文書 - P125002

前view BFT DEIMOS BT UL/CSA 電気機械式ゲート自動化システム
Discover the BFT DEIMOS BT UL/CSA, an electromechanical automation system for rack sliding gates. Featuring smart technology, 24V safe operation, and simplified installation, this system enhances gate security and convenience. Explore its technical specifications and available accessories for residential and commercial applications.
前view BFT Mitto 2M/4M リモートコーディング手順:包括的なガイド
BFT Mitto 2Mおよび4Mのガレージおよびゲートオープナー用リモコンのプログラミング方法を学びましょう。このガイドでは、デジタルスクリーン付きおよびデジタルスクリーンなしの受信機のコーディング方法と、重要な安全上の注意事項について説明します。
前view BFT VIRGO スイングゲートオートメーション 設置マニュアル
BFT VIRGO スイング ゲート自動化システムの包括的なインストールおよびユーザー ガイド。安全性、技術仕様、インストール手順、プログラミング、メンテナンスについて説明しています。
前view BFT のインストールと使用のマニュアル GIOTTO 30-60 S BT / GIOTTO 30-60 BT
BFT GIOTTO 30-60 S BT e GIOTTO 30-60 BT のインストールと自動バリア機能の操作を完了します。特定の技術、構成、および管理を含めます。
前view BFT MITTO 2B リモコンコーディング手順 | レトロリモコン
BFT MITTO 2Bリモコンをゲートオープナー用にコーディングするためのステップバイステップガイド。既存のリモコンと受信機のLCD画面を使った方法も網羅しています。トラブルシューティングのヒントも含まれています。
前view BFT CLONIX1-2 & MITTO 2-4 433MHz 無線制御システム インストールガイド
BFT CLONIX1-2 受信機と MITTO 2-4 433MHz 無線制御送信機の包括的なインストール ガイド。ゲートおよびドアの自動化のプログラミング、クローニング、安全性、技術仕様を網羅しています。